Skip over navigation
Banner
Industry
Directory Facilities Technology Transfer Economic Develop. CT BioHistory (TM)
Career
Job Search Post a Job Destination CT
News/Events
Industry News Submit News Release Calendar Submit Event CEO Reading
Patient
Clinical Trials Drug Development Resources
Education
K-12 Higher Ed BioEd Reading
About
Advertising Feedback Home
About
 Advertising
 Feedback
 Home
Quick Links
 Directory
 Job Search
 Facilities
 Calendar
 Advertising
 
Community Service Ad:  Every Child Deserves a Chance to Play Baseball
Want to target global biotech trade media?  Use B3C newswire  services.
 
Advertising
 
Want global media exposure for your company? Visit B3C to learn how.


Northwest Biotherapeutics Logo

The Construction in Progress...



Dedicated HVAC and electrical systems were installed for all laboratories and cleanrooms.  This  provides the benefit of critical temperature control in each individual laboratory and cleanroom.
Northwest Biotherapeutics primary HVAC ducting and electric Services are installed.

Northwest Biotherapeutics interior walls are erected.

Interior walls are constructed of gyp board providing one hour fire protection.  Each wall is finished with epoxy coatings to optimize cleaning and minimize bacterial growth.  All services, including gas lines, and electrical are installed in the wall system to minimize exposed piping.



General offices were constructed with Medintech vinyl flooring, while all laboratories received seamless vinyl flooring as required by the U.S. Food & Drug Administration.
Northwest Biotherapeutics installation of flooring.


The virtual tour of the Northwest Biotherapeutics campus
is provided by:

Advanced Technology Construction Logo

Return to NW Therapeutics | Return to Virtual Facilities Tour

 
Email thie page to a friend. Email This Page
to a Friend
Print this page. Print This
Page
© 2012 Info.Resource, Inc. All rights reserved.
Privacy Policy . Terms of Use . Advertising

ConnecticutLifeScience.com is owned and published by Info.Resource, Inc.